Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 4 results ...

de Blois, M, Herazo-Cueto, B, Latunova, I and Lizarralde, G (2011) Relationships between construction clients and participants of the building industry: structures and mechanisms of coordination and communication. Architectural Engineering and Design Management, 7(01), 3–22.

Deng, Y and Poon, S W (2011) Mega-challenges for mega-event flagships. Architectural Engineering and Design Management, 7(01), 23–37.

Jensen, P A (2011) Inclusive briefing and user involvement: case study of a media centre in Denmark. Architectural Engineering and Design Management, 7(01), 38–49.

Senaratne, S and Malewana, C (2011) Linking individual, team and organizational learning in construction project team settings. Architectural Engineering and Design Management, 7(01), 50–63.

  • Type: Journal Article
  • Keywords: engineering; construction; learning processes; managing teams
  • ISBN/ISSN: 1745-2007
  • URL: https://doi.org/10.3763/aedm.2010.0133
  • Abstract:
    Three levels or processes of learning are identified in project teams: individual learning, team learning and organizational learning. This article aims to explore the existing learning processes of construction project teams and identify factors that link these processes. This was approached through case studies of two construction project teams in Sri Lanka, operating under the traditional procurement method. Semi-structured interviews were conducted with five distinct participants from each case. Data were analysed using coding and cognitive mapping techniques. The research findings highlight the centrality of individual level among the three learning processes in a construction project team setting, in contrast to the centrality of team level that is established in general project-based organizations. The article further reveals key factors that effectively link the three learning processes. It is hoped that these findings will be useful to general construction teams that mainly operate under separated contract arrangements in many countries.